01
Room counts and floor area hide the actual condition of walls, ceilings, woodwork, previous coatings and failed repairs.
Painting and decorating quote software · UK
Decorating quotes are won or lost on what happens before the finish coat: protection, repairs, filling, sanding, stain blocking, caulking and access. Qwotly Ai helps decorators record surface condition and finish choices, then build an editable quote that makes the preparation visible.
AI drafts the structure. You approve every quantity, price, VAT choice and term.
Editorial owner: Lion Tech Innovations Ltd product team. Content system last reviewed 26 July 2026.
Why quotes stall
01
Room counts and floor area hide the actual condition of walls, ceilings, woodwork, previous coatings and failed repairs.
02
The customer expects a flawless finish while the quote only says paint room, with no preparation standard or defect limitations.
03
Colour changes, dark-to-light coverage, specialist coatings, wallpaper removal and stain treatment are discovered after the price is agreed.
04
Furniture movement, floor protection, access towers, drying time and occupied-property working are treated as invisible labour.
Field-to-quote workflow
STEP 01
Record each room or elevation, substrate condition, cracks, flaking, staining, previous coatings, damp concerns and access requirements.
STEP 02
Capture colours, sheen levels, brands or allowances, feature walls, wallpaper choices and whether the property remains occupied.
STEP 03
Separate protection, cleaning, stripping, repairs, filling, sanding, priming, caulking, coats, woodwork and completion.
STEP 04
State furniture handling, major plaster repairs, damp treatment, scaffolding, materials, VAT, programme and exclusions.
A quote that can be trusted
Evidence before estimate
Decision point
Qwotly helps decorators explain the work behind a durable finish. A detailed scope protects both sides: the customer sees what quality requires, and the decorator is not trapped by a one-line promise.
Frequently asked questions
Yes. Structure the quote in the way that best communicates the work, whether that is by room, elevation, phase, surface type or line item.
Yes. You can set an allowance or named specification and make clear how upgrades, specialist finishes or major colour changes affect the total.
Yes. Minor preparation can be included while major substrate repair, damp treatment or specialist remediation is clearly excluded or provisional.
No. The decorator decides the coating system and preparation based on the substrate, product and required finish.
Keep going
See how rough site evidence becomes an editable scope that you still control.
Read moreCapture the job while details are fresh instead of rebuilding it from memory later.
Read moreA practical framework for scope, exclusions, pricing checks, deposits and customer clarity.
Read more